In the beginning of March a heavy goods transport delivers the heart piece of the catalytic waste air purification unit which consists of three reaction chambers. The unit is lifted from the heavy load transporter with the help of two truck-mounted cranes and placed on its final location. Now the work to connect the pieces can begin: pipes, gas pipe connection to the burners, placement of the air blowers, electrical power supply, compressed air supply. The low-temperature-plasma unit arrives and is installed.
In the last week of March we receive an award for environmental friendly work: the “Ökoprofit”-certificate handed over by the major of the city of Mainz. Mr. Ebling.