Neuartige Abluftanlage für INEOS Granuform Betrieb

Project Blog

Here you find all LIFE+ Project news

Start-up of equipment manufacture

The machinery and plant components are now being produced at our suppliers. The provisional permit for the erection and operation of the waste air purification unit has been granted. Early […]

read more

Control of LIFE+ Project, application control and networking

A meeting with our LIFE-project supervisor, Mr. Thomas Mayer from the company Astrale, takes place in order to check whether all aims which were agreed upon for the EU-sponsoring of […]

read more

Application for the production permit

The permit application, the safety report and the application for a construction permit receive their last polish and are now finally finished. They are handed over to the Umweltamt of […]

read more

Picture 16: River boat party on the Rhine

Bilddokuvorschau16

One cannot always work; once in a while one has to celebrate,too. During a boat trip on the river Rhine and during the collective evening meal there is plenty of […]

read more

Picture 15: Project meetings

Billddoku15

The flowcharts and the safety requirements are discussed and specified in project meetings with experts from the different departments of INEOS Paraform GmbH & Co KG like work shops, plant […]

read more

Picture 14: Investigation on the best possible course of the waste air pipe

Bild 14 Autokran vor Betrieb IMG_0338[1]

The pipe which collects the emissions from the plant and leads them to the waste air purification unit must cross a street next to the plant in order to reach […]

read more

Work on the permit application

The concept, the components for the waste air purification unit and their sizes have been determined during the past months. With the technical information it is now possible to finalise […]

read more

Picture 13: Concept of the waste air purification equipment as three-chamber-unit

Bilddoku13

In this concept the pressure adjusting tank in the former design (picture 10) is replaced by another reaction chamber. With this system the best possible waste air treatment can be […]

read more

Picture 12: Low voltage distribution board

Bilddoku12

The transformer is supplied with electricity via an underground 20 kV high voltage power cable. In the transformer the high voltage electricity is converted to a 400 Volt current. Via […]

read more

Transformer and the low voltage distribution board in operation

The power transformer, the low voltage distribution board and the underground high voltage cable to the unit are installed and put into operation. Immediately, the entire unit works without a […]

read more