The power transformer, the low voltage distribution board and the underground high voltage cable to the unit are installed and put into operation. Immediately, the entire unit works without a problem and to complete satisfaction.
Tests are undertaken to find the optimum for the future air pipe (diameter 1200 mm) to the waste air purification unit using a truck-mounted crane.