The machinery and plant components are now being produced at our suppliers. The provisional permit for the erection and operation of the waste air purification unit has been granted. Early […]
read more →A meeting with our LIFE-project supervisor, Mr. Thomas Mayer from the company Astrale, takes place in order to check whether all aims which were agreed upon for the EU-sponsoring of […]
read more →The permit application, the safety report and the application for a construction permit receive their last polish and are now finally finished. They are handed over to the Umweltamt of […]
read more →One cannot always work; once in a while one has to celebrate,too. During a boat trip on the river Rhine and during the collective evening meal there is plenty of […]
read more →The flowcharts and the safety requirements are discussed and specified in project meetings with experts from the different departments of INEOS Paraform GmbH & Co KG like work shops, plant […]
read more →The pipe which collects the emissions from the plant and leads them to the waste air purification unit must cross a street next to the plant in order to reach […]
read more →The concept, the components for the waste air purification unit and their sizes have been determined during the past months. With the technical information it is now possible to finalise […]
read more →In this concept the pressure adjusting tank in the former design (picture 10) is replaced by another reaction chamber. With this system the best possible waste air treatment can be […]
read more →The transformer is supplied with electricity via an underground 20 kV high voltage power cable. In the transformer the high voltage electricity is converted to a 400 Volt current. Via […]
read more →The power transformer, the low voltage distribution board and the underground high voltage cable to the unit are installed and put into operation. Immediately, the entire unit works without a […]
read more →